Visit Certon on FacebookVisit Certon on TwitterVisit Certon on LinkedIn

CERTON’s Experience

 

Click on the projects below to see how CERTON played a role in the certification process of each aircraft.

Get Adobe Flash player

 

BD-100 Spoiler System

 

PSAC
System Overview The fly-by-wire spoiler system has eight (8) spoiler panels arranged as four (4) multifunction flight spoilers (MFS) and four (4) ground only spoilers to support roll assist, proportional lift dumping, ground lift dumping, EICAS message logic, and maintenance/diagnostics.
Safety Assessment & DAL DO-178B Level A
Stages of Involvement SOI #3 (Verification) and SOI #4 (Certification)
DER FAA Consultant DER
Configuration Management IBM Rational ClearCase
Problem Reporting IBM Rational ClearQuest
Requirements Management Telelogic DOORS and Microsoft Word in ClearCase
System Processor TI 2812
Architecture Single Circuit Card Assembly
I/O ARINC, Discrete, Analog, CCDL
Monitoring & Maintenance PBIT, CBIT, IBIT
Development Tool Qualification NONE — All tool outputs are reviewed and/or verified
Verification Tool Qualification IBM Rational Test RealTime – Low Level RBT and Structural Coverage
SDP
Low Level Requirements Manually generated models, text, tables,and figures
Source Code C and Assembly
SVP
Low Level Test Case/Procedures Manually developed and reviewed
Test Environment Fully Automated — IBM Rational Test RealTime
Structural Coverage Statement, Function Entry/Exit, Calls, Decisions, Modified Conditions/Decision Coverage (MC/DC)